RRC’s Critical Infrastructure Division (CID) is committed to serving the people of Texas by ensuring the natural gas industry consistently incorporates weatherization and reliability standards and practices to achieve uninterruptible natural gas production throughout the calendar year including periods of severe weather. To view the full notice, visit the RRC website at. Forms CI-D and CI-X are now required to be filed through RRC Online.įorm CI-D would be submitted by an operator of a facility designated as critical acknowledging the facility’s critical status based on 16 Texas Administrative Code (TAC) §3.65 and 16 TAC §25.52.įorm CI-X would be submitted by an operator certifying a facility seeks an exception to critical designation based on 16 TAC §3.65 and Texas Natural Resource Code §91.143. Hard copy form or email form submissions will no longer be accepted. The deadline to complete online submissions is Thursday, September 1, 2022. Beginning August 1, 2022, the Railroad Commission of Texas (RRC) is requiring oil and gas operators to file the Form CI-D, Acknowledgement of Critical Customer/Critical Gas Supplier Designation, and Form CI-X, Critical Designation Exception Application, using the RRC Online System at.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |